Monday, August 02, 2004

New Architecture Department Lobby
This lobby (and main hallway) ceiling will be formed by cross-vault of catenary. Physical/mathmatical foundations of catenary are:

Implementations of catenary modeling:

Tasks (target end date: 2004-8-31)
  1. understanding the math/physical foundation of catenary
  2. understanding particle system simulations
  3. setup a model of the desired catenary system
  4. program simulations
  5. create output to CAD application

0 Comments:

Post a Comment

<< Home