New Architecture Department Lobby
This lobby (and main hallway) ceiling will be formed by cross-vault of catenary. Physical/mathmatical foundations of catenary are:
Implementations of catenary modeling:
Tasks (target end date: 2004-8-31)
This lobby (and main hallway) ceiling will be formed by cross-vault of catenary. Physical/mathmatical foundations of catenary are:
Implementations of catenary modeling:
Tasks (target end date: 2004-8-31)
- understanding the math/physical foundation of catenary
- understanding particle system simulations
- setup a model of the desired catenary system
- program simulations
- create output to CAD application

0 Comments:
Post a Comment
<< Home